R AVENUE

Type : Commerical, Office

Design Period: 2015.12 ~ 2016.12  

Construction Period : 2016.09 ~ On Going

 

Site : 121-28 Cheongdam-dong, Gangnam-gu, Seoul

Site Area : 1024.80 m2

Site Coverage Area : 594.36 m2

Building-to-Land Ratio:  58% (Max.60%)

Total Floor Area : 2,999.63 m2 

Floor Area Ratio : 199.16% (Max.200%)

Building Scope : B3 - 6F

Building Height : 23.1m

Structure : RC (Postension Slab)

Exterior Finish : Board Exposed Concrete 

Lighting : TPL + Park,JiYoon

Structural : Dongyang Sturcutrual Engineering

Civil : Anam Engineering & Construction

Mechanical : Jungin Engineering

Electrical : Daekyung Electrical Engineering

Construction : JEHYO Engineering & Construction